Files
opentf/vendor/github.com/vmware/govmomi/vim25/progress/doc.go
Paul Hinze 6fe2703665 Vendor all dependencies w/ Godep
* Remove `make updatedeps` from Travis build. We'll follow up with more
   specific plans around dependency updating in subsequent PRs.
 * Update all `make` targets to set `GO15VENDOREXPERIMENT=1` and to
   filter out `/vendor/` from `./...` where appropriate.
 * Temporarily remove `vet` from the `make test` target until we can
   figure out how to get it to not vet `vendor/`. (Initial
   experimentation failed to yield the proper incantation.)

Everything is pinned to current master, with the exception of:

 * Azure/azure-sdk-for-go which is pinned before the breaking change today
 * aws/aws-sdk-go which is pinned to the most recent tag

The documentation still needs to be updated, which we can do in a follow
up PR. The goal here is to unblock release.
2016-01-29 15:08:48 -06:00

33 lines
1.3 KiB
Go

/*
Copyright (c) 2014 VMware, Inc. All Rights Reserved.
Licensed under the Apache License, Version 2.0 (the "License");
you may not use this file except in compliance with the License.
You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software
distributed under the License is distributed on an "AS IS" BASIS,
WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
See the License for the specific language governing permissions and
limitations under the License.
*/
package progress
/*
The progress package contains functionality to deal with progress reporting.
The functionality is built to serve progress reporting for infrastructure
operations when talking the vSphere API, but is generic enough to be used
elsewhere.
At the core of this progress reporting API lies the Sinker interface. This
interface is implemented by any object that can act as a sink for progress
reports. Callers of the Sink() function receives a send-only channel for
progress reports. They are responsible for closing the channel when done.
This semantic makes it easy to keep track of multiple progress report channels;
they are only created when Sink() is called and assumed closed when any
function that receives a Sinker parameter returns.
*/